Summary

France’s Flamanville 3 nuclear reactor, its most powerful at 1,600 MW, was connected to the grid on December 21 after 17 years of construction plagued by delays and budget overruns.

The European Pressurized Reactor (EPR), designed to boost nuclear energy post-Chernobyl, is 12 years behind schedule and cost €13.2 billion, quadruple initial estimates.

President Macron hailed the launch as a key step for low-carbon energy and energy security.

Nuclear power, which supplies 60% of France’s electricity, is central to Macron’s plan for a “nuclear renaissance.”

      • Forester@yiffit.net
        link
        fedilink
        English
        arrow-up
        21
        arrow-down
        3
        ·
        edit-2
        3 days ago

        It is if your intention is to not introduce carbon into the atmosphere over the 60 year life’s lifespan to 90 year lifespan of the power plant

        • Diplomjodler@lemmy.world
          link
          fedilink
          English
          arrow-up
          2
          arrow-down
          8
          ·
          3 days ago

          Great! At the current rate it’ll only take them 200 more years to replace all their old time bombs.

      • john89@lemmy.ca
        link
        fedilink
        English
        arrow-up
        5
        ·
        edit-2
        3 days ago

        Looks like there was an end to it.

        Going over budget and missing deadlines is normal for large infrastructure projects.

        If anything, seeing people’s shock at this should reveal how little they know about development.

        • einkorn@feddit.org
          link
          fedilink
          English
          arrow-up
          22
          arrow-down
          7
          ·
          3 days ago

          French nuclear energy is so heavily subsidised by the state that direct comparison seams hardly fair

        • Forester@yiffit.net
          link
          fedilink
          English
          arrow-up
          5
          arrow-down
          1
          ·
          3 days ago

          Don’t you understand line must go up, quarterly profits now consequences never .what the fuck is a long-term investment. Get that ideology out of my power plant this instant. /S